Tianjin New District will build 6 new pumping stations this year

According to the water department of Tianjin New District, this year, the new district will build 6 new pumping stations in Tanggu, Dagang and Hangu, and its drainage capacity will reach the planning standard for Tianjin drainage.

The six newly planned pumping stations are located in Tanggu, Hangu and Dagang, respectively. The Tangyu Road pumping station in Tanggu is the largest, and its designed flow rate will reach 30 cubic meters per second. The Fuzhuang Pumping Station in Hangu is designed to have At 16 cubic meters per second, several other pumping stations are located at Chadian Central Station, Daejeon Pumping Station, Qiaoyu Pumping Station and Dagang Self-Pumping Station in Hangu, with design flows of 4 cubic meters per second.

This year, the new district will also start the renovation project of agricultural bridge sluice, mainly including 23 culverts such as drainage sluice gate renovation of Xincun Pumping Station, reconstruction of Dazhan Station East Gate, reconstruction of the Zhuoshui River Guozhuangzi Bridge, and reconstruction of Yaohe Bridge. These transformations for agricultural bridges, culverts, and agricultural sluice gates will help improve siltation and poor water transfer capacity of the rivers and further enhance the drainage capacity of the river system.

Auto Spare Parts/Car Accessories

Auto Spare Parts,Car Accessories,Auto Parts,Car Parts

NINGBO LUBAN ELECTRIC POWER TOOLS CO.,LTD. , http://www.aye-group.com